Appendix- III- Bihar

Rs. in crore

Sr.No. Name of the Scheme As on 31st March 2018 As on 30th september 2018
Unspent Balance Pending Ucs Total Release in FY 2018 Unpent Balances Pending Ucs
1 Raising & Strengthening and extension of existing left and right bank embankments in Chandan river system 5.8375 5.8375 NIL 5.8375 5.8375
2 Raising & Strengthening of Adhwara and Khiroi left Embankment from RD 0.00 km. to RD 43.60 km. & from RD 44.00 km. to RD 90.50 km. and right embankment from RD 0.00 km. to RD 81.50 km. in Sitamarhi, Madhubani and Darbhanga districts of Bihar (BR-49) NIL NIL 7.783 7.783 7.783
3 Bagmati Flood Management Scheme Phase-IV(a)- Construction of sluice, tagging bund and edge protection work at Belwa on Bagmati river in Sheohar district (BR-52) NIL NIL 8.8 8.8 8.8
4 Flood protection works executed on river Kosi (Nepal portion) before the flood 2017 NIL NIL 69.0257 NIL NIL
5 Flood protection works executed on river Kosi (Nepal portion) before the flood 2015 NIL NIL 6.31886 NIL NIL
  Total 5.8375 5.8375 91.92756 22.4205 22.4205